Bentleigh

Melbourne

A period bathroom stripped back to its framing, with a glass-block window and original cornice above
Builder
Siji Projects
Stage
On site · remediation and new bathrooms
Scope
Early contractor involvement (ECI) · Surface drainage engineering · Landscape design · Subfloor remediation · Mould treatment and testing · New bathrooms

The project

A period home with a moisture problem

This Bentleigh home is a period house with a hidden problem. Long-standing moisture had taken hold below and within the building, and the result was mould through the affected rooms. The work was always going to be as much about the cause as the symptom.

We were brought in early, before the scope was fixed, to understand what was driving the moisture and to plan a fix that would hold.

A decorative period plaster cornice with the wall lining peeled back below it
A wall lining removed to reveal the timber framing and insulation behind
Affected linings stripped back to structure, with the original plaster cornices recorded before any removal

Early involvement

An ECI engagement, before a single wall came down

Our early contractor involvement set the project up properly. We delivered the drainage engineering for a new surface drainage plan, a landscape design to move water away from the building, and the subfloor remediation costings and documentation that told the owner what the work would take.

Alongside the building work, the mould was treated as its own discipline. Independent spore sampling, IICRC-certified mould treatment, and completion testing to confirm the rooms are clear before they are closed up.

A bathroom reframed back to studs, with new plumbing rough-in and the subfloor opened up
A member of the Siji Projects crew on site in a branded polo
From documentation to delivery, new framing, services and subfloor set out for the new bathrooms

Across the Bentleigh works, from strip-out to new bathrooms

Why Siji

The value is in getting in early

A moisture problem punishes a builder who only treats what they can see. By engaging early, we could deal with the cause: drainage, ground levels and the subfloor, not only the damaged rooms above.

It is not a large project, but it shows how we work on every job. Understand the problem, document the fix, treat it properly, and build the result. The owner gets bathrooms that look right and a house that stays dry.

Detail notes


  • New surface drainage plan and drainage engineering


  • Landscape design to direct water away from the building


  • Subfloor remediation costings and documentation through ECI


  • Independent spore sampling and IICRC-certified mould treatment


  • Completion testing to verify the result


  • Construction of the new bathrooms